Monitoring that starts with a building question.

Explore temperature and humidity monitoring for damp, condensation, drying progress and repair review, alongside building inspection findings.

Damp and condensation

When do conditions change?

What to monitor
Track temperature and humidity at agreed locations, then compare the pattern with inspection findings, heating, ventilation and building use.
How the record helps
Temperature and humidity patterns can help determine the causes of condensation when considered alongside the physical survey, heating, ventilation and building use.
Next step
Use the record to focus further checks.

Air readings alone do not identify the moisture source.

A person in protective clothing beside extensive dark mould on internal walls.
Trace Surveys building investigation work. Photograph © Trace Surveys Ltd.

Drying progress

How are conditions changing as the building dries?

What to monitor
Follow conditions at selected points after water damage or remedial work. A time series helps show where progress changes and where another visit may be useful.
How the record helps
A steady record between visits shows whether conditions are settling, stalling or changing with the weather and heating.
Next step
Plan direct material checks at the appropriate time.

Acceptable material dryness needs a suitable material measurement method.

A green moisture-scanning instrument held against an internal wall above the skirting board.
Trace Surveys building investigation work. Photograph © Trace Surveys Ltd.

Before and after repairs

What changed after the work?

What to monitor
Establish a baseline and compare it with a suitable period after the intervention, recording changes in weather, heating and building use.
How the record helps
Comparing like-for-like periods, with the surrounding circumstances noted, makes the before-and-after picture easier to explain.
Next step
Review whether the observations support the intended outcome.

A change in readings alone does not prove a repair succeeded or failed.

A black wall-mounted sensor with a wired probe beside interior wall panelling.
Wall-mounted sensor and wired probe. Photograph supplied by the owner.

Monitoring guide

Planning a damp or condensation investigation?

Start with the question, choose suitable measurement points and keep the inspection context with the readings.

How to monitor damp and condensationDamp and mould in social housingCase study: Network Rail

Planning

Plan monitoring around the decision.

Monitoring should be planned around the decision you need to make, including where readings are taken and how they will be interpreted.

  1. Step 1

    Define the question

    Agree what decision the monitoring needs to support and what would count as useful evidence.

  2. Step 2

    Choose measurement points

    Decide where readings are taken, what is measured and how the results will be interpreted.

  3. Step 3

    Agree the review period

    Set how long to monitor and when the record will be reviewed alongside inspection findings.

See the measurements available

Start with your building question.

Tell us what you have noticed, where it is happening and what you need to decide.

Discuss a monitoring project